Skip to content

What is the difference between CG 20 10 and CG 20 37, and which additional insured endorsement does a subcontract need?

By , CEO, Rayon · Last reviewed

Usually both. CG 20 10 makes the owner or general contractor an additional insured for your ongoing work, and that status ends when the work is complete. CG 20 37 carries it into completed operations, which is when most defect claims arrive. A subcontract that asks for “ongoing and completed operations” is asking for the pair.

Want this checked on your own certificates? Bring 50 you have already sent and keep the findings. Book a walkthrough

What does each endorsement do?

CG 20 10CG 20 37
Covers the additional insured forYour ongoing operationsYour completed work (the products-completed operations hazard)
Ends whenYour work at the location is completeThe policy that carries it is no longer in force
Applies toThe person, organisation and location in its scheduleThe person, organisation, location and work in its schedule
Limited byWhat the contract requires, and the policy’s limitsWhat the contract requires, and the policy’s limits

Why is CG 20 10 alone not enough?

On a data-center job the expensive claims tend to come after handover: a cooling loop that leaks in year two, a busway connection that fails under load [3]. By then your ongoing operations are over, so CG 20 10 no longer gives the owner or general contractor any status under your policy [1]. Completed-operations status comes from CG 20 37, which covers the additional insured for your work included in the products-completed operations hazard [2].

Compliance reviewers know this. A certificate that shows additional insured status without completed operations is one of the most common reasons a certificate is sent back, as why compliance vendors reject certificates of insurance sets out.

What should I look for in the subcontract?

  • The words “ongoing and completed operations”, or the two form numbers named outright. If the same clause asks for primary and noncontributory cover, see what “primary and noncontributory” takes.
  • Who must be named. Data-center contracts often list the owner, the general contractor and the lender.
  • How long completed-operations status must be kept. This is usually stated in years after substantial completion, which means renewing the endorsement on later policies.
  • Edition dates. Some contracts name an older edition with broader wording; ask your broker what your insurer will actually issue. The editions are compared in why contracts ask for CG 20 10 11 85.

Does “blanket” additional insured wording solve it?

A blanket endorsement grants status to anyone you have agreed in a written contract to add, so you do not have to schedule each party. It is convenient, but read it: some blanket forms cover ongoing operations only, and some require a direct contract between you and the party, which a project owner or lender may not have with a subcontractor. How blanket status is evidenced is in showing additional insured status under CG 20 33 or CG 20 38.

Sources

  1. ISO CG 20 10 04 13, Additional Insured: Owners, Lessees or Contractors, Scheduled Person or Organization
  2. ISO CG 20 37 04 13, Additional Insured: Owners, Lessees or Contractors, Completed Operations
  3. AGC, Insurance Issues in Constructing Data Centers: A GC’s Perspective (2026)

How these articles are written and checked. General information, not legal advice or an interpretation of your policy. Policy forms and endorsements control. Form numbers are © Insurance Services Office, Inc. and are cited for reference.